Arbeitsberichte

2017
Tempelmeier, H.
Produktionsplanung in Supply Chains, 
5th edition, 
Norderstedt:
Books on Demand, 
2017.
Kirste, M.
Dynamic lot sizing problems with stochastic production output, 
Norderstedt: 
Books on Demand, 
2017.
Günther, H.-O. and Tempelmeier, H.
Übungsbuch Produktion und Logistik: Supply Chain und Operations Management, 
9th edition, 
Norderstedt: 
Books on Demand, 
2017.
Copil, K., Wörbelauer, M., Meyr, H. and Tempelmeier, H.
in: OR Spectrum
Vol. 39 
No. 1 
(2017), 
pp. 1-64.
2016
Günther, H.-O. and Tempelmeier, H.
Produktion und Logistik: Supply Chain und Operations Management, 
12th edition, 
Norderstedt: 
Books on Demand, 
2016.
Tempelmeier, H.
Produktionsplanung in Supply Chains, 
4th edition, 
Norderstedt: 
Books on Demand, 
2016.
Hilger, T., Sahling, F. and Tempelmeier, H.
in: OR Spectrum
Vol. 38 
No. 4 
(2016), 
pp. 849-876.
Copil, K.
Capacitated Lot-Sizing and Scheduling with Scarce Setup Resources, 
Norderstedt: 
Books on Demand, 
2016.
Tempelmeier, H. and Copil, K.
in: OR Spectrum
Vol. 38 
No. 4 
(2016), 
pp. 819-847.
2015
Tempelmeier, H.
Bestandsmanagement in Supply Chains, 
5th edition, 
Norderstedt: 
Books on Demand, 
2015.
Tempelmeier, H.
Produktionsplanung in Supply Chains, 
3rd edition, 
Norderstedt: 
Books on Demand, 
2015.
Tempelmeier, H.
Supply Chain Management und Produktion — Übungen und Mini-Fallstudien, 
4th edition, 
Norderstedt: 
Books on Demand, 
2015.
Hilger, T. J.
Stochastic Dynamic Lot-Sizing in Supply Chains, 
Norderstedt: 
Books on Demand, 
2015.
Tempelmeier, H. and Bantel, O.
in: European Journal of Operational Research 
Vol. 247 
No. 1 
(2015), 
pp. 101-112.
Tempelmeier, H. and Hilger, T.
in: Computers & Operations Research 
Vol. 59 
(2015), 
pp. 119–125.
2014
Bantel, O.
Integriertes Bestandsmanagement in mehrstufigen Supply Chains, 
Aachen: 
Shaker Verlag, 
2014.
Tempelmeier, H.
Produktionsplanung in Supply Chains, 
2nd edition, 
Norderstedt: 
Books on Demand, 
2014.
Günther, H.-O. and Tempelmeier, H.
Produktion und Logistik: Supply Chain und Operations Management, 
11th edition, 
Norderstedt: 
Books on Demand, 
2014.
2013
Günther, H.-O. and Tempelmeier, H.
Übungsbuch Produktion und Logistik: Supply Chain und Operations Management, 
8th edition, 
Norderstedt: 
Books on Demand, 
2013.
Tempelmeier, H.
in: MacGregor Smith, J., Tan, B. (Ed.), 
Handbook of Stochastic Models and Analysis of Manufacturing System Operations, 
Berlin: 
Springer 
2013, 
pp. 113–143.
Tempelmeier, H.
in: International Journal of Production Research 
(2013), 
pp. 6880–6890.
Lagershausen, S., Manitz, M. and Tempelmeier, H.
Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces, 
in: IIE Transactions 
Vol. 45 
(2013), 
pp. 502-515.
Stolletz, R. and Lagershausen, S.
in: International Journal of Production Research 
(2013), 
pp. 1366-1378.
2012
Lagershausen, S.
Performance Analysis of Closed Queueing Networks, 
Springer, 
Berlin u. a.: 
2012.
Tempelmeier, H.
Dynamische Losgrößenplanung in Supply Chains, 
1st edition, 
Norderstedt: 
Books on Demand, 
2012.
Tempelmeier, H.
Bestandsmanagement in Supply Chains, 
4th edition, 
Norderstedt: 
Books on Demand, 
2012.
Manitz, M. and Tempelmeier, H.
in: OR Spectrum 
(2012), 
pp. 273–291.
Briskorn, D. and Horbach, A.
in: Computers & Operations Research 
Vol. 39. 
No. 3 
(2012), 
pp. 718–727.
Büther, M. and Briskorn, D.
in: International Journal of Operations Research and Information Systems 
Vol. 3. 
No. 1 
(2012), 
pp. 1-12.
Choi, B.-C. et al.
in: Production and Operations Management 
Vol. 21. 
No. 1 
(2012), 
pp. 115–128.
Horbach, A., Bartsch, T.and Briskorn, D.
in: Journal of Scheduling 
Vol. 15. 
No. 1, 
(2012), 
pp. 117–125.
Lee, K. et al.
in: Naval Research Logistics 
Vol. 59. 
No. 3-4, 
(2012), 
pp. 226–277.
Lagershausen, S.
Exact inter-departure-time distribution, 
University of Cologne, 
2012. 
Lagershausen, S.
Distribution of the time between processing starts, 
University of Cologne, 
2012.
2011
Günther, H.-O. and Tempelmeier, H.
Produktion und Logistik, 
9th edition, 
Berlin: 
Springer, 
2011.
Tempelmeier, H.
in: Omega 
Vol. 39. 
No. 6 
(2011), 
pp. 627–633.
Tempelmeier, H. and Herpers, S.
in: European Journal of Operational Research 
Vol. 212. 
No. 3 
(2011), 
pp. 497–507.
Briskorn, D.
in: Journal of the Operational Research Society 
Vol. 62. 
No. 12 
(2011), 
pp. 2133–2145.
Briskorn, D., Leung, J. and Pinedo, M.
in: IIE Transactions 
Vol. 43. 
No. 6 
(2011), 
pp. 383–398.
Lagershausen, S.
Exact performance analysis of closed queueing systems with phase-type distributed processing times and blocking, 
University of Cologne, 
2011.
2010
Tempelmeier, H.
Supply Chain Management und Produktion — Übungen und Mini-Fallstudien, 
3rd edition, 
Norderstedt: 
Books on Demand, 
2010.
Günther, H.-O. and Tempelmeier, H.
Übungsbuch Produktion und Logistik, 
7th edition, 
Berlin: 
Springer, 
2010.
Buschkühl, L. et al.
in: OR Spectrum 
Vol. 32. 
No. 2 
(2010), 
pp. 231–261.
Tempelmeier, H. and Fischer, L.
in: International Journal of Production Research 
Vol. 48. 
No. 21 
(2010), 
pp. 6275–6291.
Tempelmeier, H. and Herpers, S.
in: International Journal of Production Research 
Vol. 48. 
No. 17 
(2010), 
pp. 5181–5193.
Barth, W., Manitz, M. and Stolletz, R.
in: Production and Operations Management 
Vol. 19. 
No. 6 
(2010), 
pp. 757–768.
Briskorn, D. et al.
in: European Journal of Operational Research 
Vol. 207. 
No. 2 
(2010), 
pp. 605–619.
Briskorn, D., Drexl, A. and Spieksma, F. C. R.
in: 4OR 
Vol. 8. 
No. 4 
(2010), 
pp. 365–374.
Briskorn, D. and Knust, S.
in: Discrete Applied Mathematics 
Vol. 158. 
No. 2 
(2010), 
pp. 123–135.
Hartmann, S. and Briskorn, D.
in: European Journal of Operational Research 
Vol. 207. 
No. 1 
(2010), 
pp. 1–14.
van't Hof, P., Post, G. and Briskorn, D.
in: OR Letters 
Vol. 38. 
No. 6 
(2010), 
pp. 592–596.
Nurmi, K. et al.
in: AIP Conference Proceedings 
Vol. 1285. 
No. 1 
(2010), 
pp. 14-28.
Boysen, N. and Briskorn, D. and Tschöke, M.
Truck Scheduling in Cross Docking Terminals with fixed Outbound Departures, 
University of Cologne, 
2010.
Briskorn, D. and Stolletz, R.
University of Cologne, 
2010.
Choi, B.-C. and Briskorn, D.
University of Kiel. 
2010.
2009
Herpers, S.
Dynamische Losgrößenplanung bei stochastischer Nachfrage, 
Kölner Wissenschaftsverlag, 
Köln: 
2009.
Sahling, F., Buschkühl, L., Tempelmeier, H. and Helber, S.
in: Computers & Operations Research 
Vol. 36. 
No. 9 
(2009), 
pp. 2546–2553.
Tempelmeier, H. and Buschkühl, L.
in: OR Spectrum 
Vol. 31. 
No. 2 
(2009), 
pp. 385–404.
Briskorn, D.
in: WiSt - Wirtschaftswissenschaftliches Studium 
No. 10 
(2009), 
pp. 506–512.
Briskorn, D.
in: European Journal of Operational Research 
Vol. 192. 
No. 3 
(2009), 
pp. 744–754.
Briskorn, D. and Drexl, A.
in: European Journal of Operational Research 
Vol. 197. 
No. 1 
(2009), 
pp. 68–76.
Briskorn, D. and Drexl, A.
in: Journal of the Operational Research Society 
Vol. 60. 
No. 1 
(2009), 
pp. 84–93.
Briskorn, D. and Drexl, A.
in: Computers & Operations Research 
Vol. 36. 
No. 3 
(2009), 
pp. 837–852.
Fischer, L.
Bestandsmanagement für das Supply Chain Management, 
in: OR News 
Vol. 37. 
No. November 
(2009), 
pp. 16–18.
Briskorn, D. and Choi, B.-C. and Lee, K. and Leung, J., et. al.
University of Kiel. 
2009.
2008
Buschkühl, L.
Multi-Level Capacitated Lotsizing with Setup Carryover, 
Kölner Wissenschaftsverlag, 
Köln: 
2008.
Fischer, L.
Bestandsoptimierung für das Supply Chain Management: Zeitdiskrete Modelle und praxisrelevante Ansätze, 
Books on Demand, 
Norderstedt: 
2008.
Tempelmeier, H.
Material-Logistik, 
7th edition, 
Berlin u. a.: 
Springer, 
2008.
Arnold, D., Isermann, H., Kuhn, A. and Tempelmeier, H. (Ed.).
Handbuch Logistik, 
3rd edition, 
Berlin u. a.: 
Springer, 
2008.
Tempelmeier, H. and Buschkühl, L.
in: International Journal of Production Economics 
Vol. 113. 
No. 1 
(2008), 
pp. 401–412.
Briskorn, D.
in: Operations Research Letters 
Vol. 36. 
No. 3 
(2008), 
pp. 283–284.
Briskorn, D.
In: Kalcsics, J., Nickel, S. (Ed.). 
Operations Research Proceedings 2007. 
Berlin: 
Springer, 
2008, 
pp. 403–408.
Drexl, A. and Briskorn, D.
Die Spielpläne von Sportligen, 
in: WISU - Das Wirtschaftsstudium 
No. 2 
(2008), 
pp. 219–225.
Fischer, L. and Manitz, M.
An Exact Discrete-Time Model of a Two-Echelon Inventory System with Two Customer Classes, 
In: Fleischmann, B., Borgwardt, K.-H., Klein, R., Thuma, A. (Ed.). 
Operations Research Proceedings 2008. 
Berlin: 
Springer, 
2008, 
pp. 185–190.
Manitz, M.
in: Computers and Operations Research 
Vol. 35. 
No. 8 
(2008), 
pp. 2520–2536.
Briskorn, D. and Knust, S.
University of Kiel. 
2008.
2007
Stich, Ch.
Produktionsplanung in der Automobilindustrie: Optimierung des Ressourceneinsatzes im Serienanlauf, 
Kölner Wissenschaftsverlag, 
Köln: 
2007.
Tempelmeier, H.
in: European Journal of Operational Research 
Vol. 181. 
No. 1 
(2007), 
pp. 184–194.
Briskorn, D. and Drexl, A.
In: Waldmann, K.-H., Stocker, U. M. (Ed.) 
Operations Research Proceedings 2006. 
Berlin: 
Springer, 
2007, 
pp. 523–528.
Fischer, L., Herpers, S. and Manitz, M.
Service-level oriented lot sizing under stochastic demand, 
In: Kalcsics, J., Nickel, S. (Ed.) 
Operations Research Proceedings 2007. 
Berlin: 
Springer, 
2007, 
pp. 351–356.
Hartmann, S., Briskorn, D. and Kemme, N.
Simulation und Optimierung fahrerloser Transportsysteme, 
in: Industrie Management 
No. 4 
(2007), 
pp. 37–40.
Manitz, M., Fischer, L. and Herpers, S.
WISU-Checkup Bestandsmanagement, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 36. 
No. 1 
(2007), 
pp. 73–74.
Manitz, M., Fischer, L. and Herpers, S.
WISU-Checkup Operative Produktionsplanung und -steuerung, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 36. 
No. 6 
(2007), 
pp. 796–797.
2006
Coupette, J.
Kapazitätsorientierte Zuschnitt- und Reihenfolgeplanung mit Lieferterminen, 
Books on Demand, 
Norderstedt: 
2006.
Tempelmeier, H.
in: European Journal of Operational Research 
Vol. 174. 
No. 1 
(2006), 
pp. 600–621.
Tempelmeier, H., Schröer, K. and Schwarz, M.
Simultane Optimierung der Taktzeiten und Puffergrößen im Karosseriebau, 
in: Zeitschrift für wirtschaftlichen Fabrikbetrieb 
Vol. 101. 
No. 1 
(2006), 
pp. 35–41.
Briskorn, D.
Scheduling Sport Leagues using Branch-and-Price, 
In: Burke, E. K., Rudova, (Ed.) 
Proceedings of the 6th International Conference on the Practice And Theory of Automated Timetabling (PATAT), Brno, Tschechien, 30. August - 1. September 2006. 
Berlin: 
Springer, 
2006, 
pp. 367–369.
Briskorn, D.
in: IIE Transactions 
Vol. 38. 
No. 11 
(2006), 
pp. 1045–1047.
Briskorn, D., Drexl, A. and Hartmann, S.
in: OR Spectrum 
Vol. 28. 
No. 4 
(2006), 
pp. 611–630.
Briskorn, D. and Hartmann, S.
Haasis, H.-D., Kopfer, H., Schönberger, J. (Ed.) 
Operations Research Proceedings 2005. 
Berlin: 
Springer, 
2006, 
pp. 97–102.
Herpers, S. and Schulz, T.
Modellierung eines integrierten Produktion-Lager-Knotens, 
in: Simulation in Produktion und Logistik 
(2006). 
Manitz, M. and Albers, S.
WISU-Lexikon Supply Chain Management, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 35. 
No. 6 
(2006), 
pp. Beihefter.
Manitz, M. et al.
WISU-Checkup Material-Logistik, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 35. 
No. 11 
(2006), 
pp. 1386–1387.
2005
Manitz, M.
Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten, 
Kölner Wissenschaftsverlag, 
Köln: 
2005.
Tempelmeier, H.
Produktion und Logistik, 
in: Vahlens Kompendium der Betriebswirtschaftslehre 
Vol. 1 
(2005), 
pp. 237–307.
Manitz, M.
Warteschlangentheorie, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 34. 
No. 7 
(2005), 
pp. 881–885.
Manitz, M. et al.
WISU-Lexikon Produktionswirtschaft, 
in: WISU -- Das Wirtschaftsstudium 
Vol. 34. 
No. 11 
(2005), 
pp. I–XVI.
2004
Tempelmeier, H.
Konfigurationsplanung bei Werkstattproduktion, 
in: Handbuch Logistik 
Vol. 2 
(2004), 
pp. A3-15–A3-21.
Manitz, M.
Ein Dekompositionsverfahren zur Bestimmung der Produktionsrate einer Fließproduktionslinie mit Montagestationen und stochastischen Bearbeitungszeiten, 
In: Fleuren, H., Kort, P. (Ed.) 
Operations Research Proceedings 2004. 
Berlin: 
Springer, 
2004, 
pp. 110–117.
2003
Tempelmeier, H.
in: International Journal of Production Research 
Vol. 41. 
No. 1 
(2003), 
pp. 149–170.
Tempelmeier, H.
Simultaneous Buffer and Workload Optimization for Asynchronous Flow Production Systems, 
in: University of Agean, Department of Product and Systems Design Engineering 
(2003), 
pp. 31–39.
Tempelmeier, H. and Reith-Ahlemeier, G.
Advanced Purchasing and Order Management, 
in: Supply Chain Management and Reverse Logistics 
(2003), 
pp. 349–370.
Antweiler, J., Banike, M. and Meng, A.
Rüstzeitoptimierte Auftragsreihenfolgen für Walzstraßen, 
in: Zeitschrift für wirtschaftlichen Fabrikbetrieb 
Vol. 98. 
No. 3 
(2003), 
pp. 112–114.
Reith-Ahlemeier, G.
Resource-orientated Purchase Planning and Supplier Selection — Models and Algorithms for Supply Chain Optimization and E-Commerce, 
In: Ahr, D., Fahrion, R., Oswald, M. (Ed.) 
Operations Research Proceedings 2003. 
Berlin: 
Springer, 
2003, 
pp. 20–25.
Sain, S. and Herpers, S.
Profit maximization in multi service networks — an optimization model, 
Proceedings of the 11th European Conference on Information Systems (Naples, Italy). 
2003, 
pp. 112–114.
2002
Reith-Ahlemeier, G.
Ressourcenorientierte Bestellmengenplanung und Lieferantenauswahl — Modelle und Algorithmen für Supply Chain Optimierung und E-Commerce, 
Books on Demand, 
Norderstedt: 
2002.
Tempelmeier, H.
A simple heuristic for dynamic order sizing and supplier selection with time-varying data, 
in: Production and Operations Management 
Vol. 11. 
No. 4 
(2002), 
pp. 499–515.
Antweiler, J., Banike, M. and Werth, L.
Rüstzeitoptimierung bei Ziehmaschinen, 
in: Draht 
Vol. 52. 
No. 5 
(2002), 
pp. 22–24.
2001
Tempelmeier, H.
Supply Chain Planning with Advanced Planning Systems, 
Proceedings of the 3rd Aegean International Conference on Design and Analysis of Manufacturing Systems (Tinos Island, Greece). 
2001.
Tempelmeier, H. and Bürger, M.
in: IIE Transactions 
Vol. 33. 
No. 4 
(2001), 
pp. 293–302.
2000
Tempelmeier, H.
in: OR Spektrum 
Vol. 22. 
No. 3 
(2000), 
pp. 361–380.
1999
Tempelmeier, H.
Advanced Planning Systems, 
in: Industrie Management 
Vol. 15. 
No. 5 
(1999), 
pp. 69–72.
Tempelmeier, H.
Performance Evaluation of Unbalanced Flow Lines with Limited Buffers, 
Proceedings of the 3rd International Conference on Engineering Design and Automation. 
1999.
1998
Gstettner, S.
Leistungsanalyse von Produktionssteuerungssystemen, 
Physica, 
Heidelberg: 
1998.
Kuhn, H.
Fließproduktionssysteme — Leistungsbewertung, Konfigurations- und Instandhaltungsplanung, 
Physica, 
Heidelberg: 
1998.
Tempelmeier, H.
Anwendung der Simulation bei der Auslegung von Fließproduktionssystemen, 
in: Logistik 
(1998), 
pp. 369–380.
Tempelmeier, H.
MRPrc-Auftragsgrößenplanung bei Werkstattproduktion, 
in: Innovationen in der Produktionswirtschaft-Produkte, Prozesse, Planung und Steuerung 
(1998), 
pp. 193–216.
Tempelmeier, H.
Beschaffung und Logistik, 
in: Kompendium der Betriebswirtschaftslehre 
(1998), 
pp. 235–274.
1997
Bürger, M.
Konfigurationsplanung flexibler Fließproduktionssysteme, 
Galda + Wilch, 
Glienicke and Berlin: 
1997.
Geselle, M.
Hierarchische Produktionsplanung bei Werkstattproduktion, 
Galda + Wilch, 
Glienicke and Berlin: 
1997.
Tempelmeier, H.
Rationalisierungspotentiale im Bestandsmanagement, 
in: Zeitschrift für Logistik 
Vol. 18. 
No. 3 
(1997), 
pp. 26–29.
Tempelmeier, H.
in: Production Planning & Control 
Vol. 8. 
No. 5 
(1997), 
pp. 451–461.
Kuhn, H. and Tempelmeier, H.
Analyse von Fließproduktionssystemen, 
in: Zeitschrift für Betriebswirtschaft 
Vol. 67. 
No. 5 
(1997), 
pp. 561–586.
Kuhn, H.
in: European Journal of Operational Research 
Vol. 100. 
No. 3 
(1997), 
pp. 514–536.
Kuhn, H. and Ditt, St.
in: International Journal of Operational Research 
Vol. 35. 
No. 6 
(1997), 
pp. 1785–1787.
Kuhn, H. and Tetzlaff, U.
Performance Evaluation of Repair Systems with Priorities, 
In: Kischka, P., Lorenz, H., Derigs, U., Domschke, W., Kleinschmidt, P., Möhring, R. (Ed.) 
Operations Research Proceedings 1997. 
Berlin: 
Springer, 
1997, 
pp. 242–247.
1996
Tempelmeier, H.
Flexible Fertigungstechniken, 
in: Handwörterbuch der Produktionswirtschaft 
(1996), 
pp. 501–512.
Tempelmeier, H. and Derstroff, M.
A Lagrangean-based heuristic for dynamic multi-level multi-item constrained lotsizing with setup times, 
in: Management Science 
Vol. 42. 
No. 5 
(1996), 
pp. 738–757.
Tempelmeier, H. and Geselle, M.
MRP rc-A planning approach for dynamic multi-level lot sizing, 
Proceedings of the First Asia-Pacific Decision Science Institue Conference. 
Berlin: 
Springer, 
1996, 
pp. 1123–1130.
Tempelmeier, H. and Kuhn, H.
Softwaretools zur Kapazitätsplanung flexibler Produktionssysteme, 
in: Industrie Management 
Vol. 12. 
No. 3 
(1996), 
pp. 29–33.
Gstettner, S. and Kuhn, H.
in: International Journal of Production Research 
Vol. 34. 
No. 11 
(1996), 
pp. 3253–3273.
Gstettner, S. and Kuhn, H.
KANBAN-System mit mehreren Produktarten, 
in: Das Wirtschaftsstudium 
Vol. 25. 
No. 6 
(1996), 
pp. 554–559.
Kuhn, H.
Fertigungs- und Montagehilfsmittel-Bewirtschaftung, 
in: Handwörterbuch der Produktionswirtschaft 
(1996), 
pp. 451–46.
Kuhn, H.
Simultane Planung der Produktions- und Instandhaltungspotentiale, 
In: Zimmermann, U. (Ed.) 
Operations Research Proceedings 1996. 
Berlin: 
Springer, 
1996, 
pp. 382–387.
Kuhn, H.
Analyse des Einflusses des Entstörpersonals auf das Ausbringungsverhalten automatisierter Montageanlagen, 
Universität zu Köln, Seminar für Supply Chain Management und Produktion. 
Köln: 
1996.
1995
Antweiler, J.
Wirtschaftlichkeitsanalyse von Informations- und Kommunikationssystemen — Wirtschaftlichkeitsprofile als Entscheidungsgrundlage, 
Datakontext, 
Köln: 
1995.
Günther, H.-O. and Tempelmeier, H.
Produktionsmanagement, 
2nd edition, 
Berlin u. a.: 
Springer, 
1995.
Tempelmeier, H.
Auftragsgrößenplanung bei Werkstattproduktion-Ein weißer Fleck in der PPS-Landschaft, 
in: Das Potential der Lean-Techniken in der Kraftfahrzeugwirtschaft: Aktuelle Entwicklungen der Material-Logistik in Theorie und Praxis 
(1995), 
pp. 1–20.
Tempelmeier, H. and Günther, H.-O.
Systeme und Verfahren der Produktionssteuerung, 
in: CIM Management 
Vol. 11. 
No. 1 
(1995), 
pp. 44–48.
Antweiler, J.
Wirtschaftlichkeitsanalyse personalwirtschaftlicher Software auf der Basis von Wirtschaftlichkeitsprofilen, 
in: Computergestützte Personalplanung 
Vol. 3. 
No. 4 
(1995), 
pp. 195–201.
Antweiler, J.
Wirtschaftlichkeitsanalyse von Informations- und Kommunikationssystemen auf der Basis von Wirtschaftlichkeitsprofilen, 
in: Information Management 
Vol. 10. 
No. 4 
(1995), 
pp. 56–64.
Kuhn, H.
Simultane Planung der Produktions- und Instandhaltungspotentiale, 
Universität zu Köln, Seminar für Supply Chain Management und Produktion. 
Köln: 
1995.
1994
Tempelmeier, H.
Anwendung der Simulation bei der Auslegung von Fließproduktionssystemen, 
in: Logistik 
(1994), 
pp. 297–308.
Drexl, A. et al.
Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme, 
in: Zeitschrift für betriebswirtschaftliche Forschung 
Vol. 46. 
No. 12 
(1994), 
pp. 1022–1045.
Tempelmeier, H. and Helber, St.
in: European Journal of Operational Research 
Vol. 75. 
No. 2 
(1994), 
pp. 296–311.
Tempelmeier, H., Hesselbach, J. and Kuhn, H.
Analyse der Wirtschaftlichkeit störungsreduzierender Maßnahmen an einer Fließlinie, 
in: Zeitschrift für wirtschaftliche Fertigung und Automatisierung 
Vol. 89. 
No. 3 
(1994), 
pp. 136–138.
1993
Tempelmeier, H. and Kuhn, H.
Flexible Manufacturing Systems — Decision Support for Design and Operation, 
New York: 
Wiley, 
1993.
Tempelmeier, H.
in: European Journal of Operational Research 
Vol. 65. 
No. 1 
(1993), 
pp. 96–117.
Tempelmeier, H. and Derstroff, M.
in: OR Spektrum 
Vol. 15. 
No. 2 
(1993), 
pp. 63–73.
1992
Tempelmeier, H. and Kuhn, H.
Flexible Fertigungssysteme — Entscheidungsunterstützung für Konfiguration und Betrieb, 
Berlin u. a.: 
Springer, 
1992.
Tempelmeier, H.
Planung flexibler Fertigungssysteme, 
in: Das Wirtschaftsstudium 
Vol. 21. 
No. 5 
(1992), 
pp. 407–413.
Tempelmeier, H.
Design of Machining Systems, 
in: Intelligent Design and Manufacturing: A Reference Book 
(1992), 
pp. 303–325.
Tempelmeier, H.
Beschaffung, Materialwirtschaft, Logistik, 
in: Handwörterbuch der Betriebswirtschaft 
(1992), 
pp. 312–325.
Tempelmeier, H. and Kuhn, H.
in: OR Spektrum 
Vol. 14. 
No. 4 
(1992), 
pp. 177–192.
1991
Tempelmeier, H.
Simulation mit SIMAN — Ein praktischer Leitfaden zur Modellentwicklung und Programmierung, 
Heidelberg: 
Physica, 
1991.
1990
Kuhn, H.
Einlastungsplanung von flexiblen Fertigungssystemen, 
Physica 
Heidelberg: 
1990.
Tempelmeier, H., Kuhn, H. and Tetzlaff, U.
Performance evaluation of flexible manufacturing systems with starving, 
Proceedings of International Conference on Modern Production Concepts. 
Berlin: 
Springer, 
1990, 
pp. 584–600.
1989
Tempelmeier, H.
Konfigurierung flexibler Fertigungssysteme auf dem Personal Computer, 
in: Zeitschrift für wirtschaftliche Fertigung und Automatisierung 
Vol. 84. 
No. 8 
(1989), 
pp. 448–450.
Tempelmeier, H., Kuhn, H. and Tetzlaff, U.
Performance Evaluation of Flexible Manufacturing Systems with Blocking, 
in: International Journal of Production Research 
Vol. 27. 
No. 11 
(1989), 
pp. 1963–1979.
1988
Tempelmeier, H.
Kapazitätsplanung für flexible Fertigungssysteme, 
in: Zeitschrift für Betriebswirtschaft 
Vol. 58. 
No. 9 
(1988), 
pp. 963–980.
1987
Tempelmeier, H.
Die Simulation eines zweistufigen Produktions- und Materialflußsystems mit SIMAN, 
in: Simulation in der Betriebswirtschaftslehre 
(1987), 
pp. 187–199.
Tempelmeier, H. and Endesfelder, Th.
Der Siman Modul Prozessor-ein flexibles Softwaretool zur Erzeugung von SIMAN-Simulationsmodellen, 
in: Angewandte Informatik 
Vol. 29. 
No. 3 
(1987), 
pp. 104–110.
1986
Tempelmeier, H.
Simulation fertigungswirtschaftlicher Probleme mit SLAM II und SIMAN, 
in: Angewandte Informatik 
Vol. 28. 
No. 2 
(1986), 
pp. 51–60.
Tempelmeier, H.
Losgrößenplanung in PPS-Systemen: Probleme des Sukzessivplanungskonzeptes in PPS-Systemen, 
in: Zeitschrift für Logistik 
Vol. 7. 
No. 9 
(1986), 
pp. 62–64.
1985
Tempelmeier, H.
in: European Journal of Operational Research 
Vol. 19. 
No. 3 
(1985), 
pp. 313–323.
1983
Tempelmeier, H.
Quantitative Marketing-Logistik — Entscheidungsmodelle, Lösungsverfahren, EDV-Programme, 
Berlin u. a.: 
Springer, 
1983.
Tempelmeier, H.
Lieferzeit-orientierte Lagerungs- und Auslieferungsplanung, 
Würzburg, Wien: 
Physica, 
1983.
Tempelmeier, H., Weber, K. and Trzebiner, R.
Simulation mit GPSS — Lehr- und Handbuch mit wirtschaftswissenschaftlichen Anwendungsbeispielen, 
Bern: 
Haupt, 
1983.
Tempelmeier, H.
Die Minimierung des Sicherheitsbestands in einem zweistufigen Lagersystem mit stochastischer Nachfrage unter Berücksichtigung einer Service-Restriktion, 
in: Zeitschrift für betriebswirtschaftliche Forschung 
Vol. 35. 
No. 11 
(1983), 
pp. 986–1003.
1982
Tempelmeier, H.
Lieferzeit anstatt Fehlmenge als marketing-orientiertes Servicekriterium in der Lagerhaltungsplanung, 
in: Zeitschrift für betriebswirtschaftliche Forschung 
Vol. 34. 
No. 4 
(1982), 
pp. 335–350.
1981
Tempelmeier, H.
Multiple Standortmodelle in der Ebene und ihre Lösung mit Hilfe clusteranalytischer Suchverfahren, 
Proceedings in Operations Research 1980. 
Berlin: 
Springer, 
1981, 
pp. 384–385.
1980
Tempelmeier, H.
Standortoptimierung in der Marketing-Logistik, 
Königstein: 
Anton Hain, 
1980.
Tempelmeier, H.
Die Bestimmung des optimalen Standorts eines Auslieferungslagers bei entfernungsabhängiger Nachfrage und nicht-linearen Transportkosten, 
in: Zeitschrift für Operations Research 
Vol. 24. 
No. 6 
(1980), 
pp. B167–B187.
1978
Tempelmeier, H.
Die Planung von Versorgungssystemen — Kritische Bemerkungen und Verallgemeinerung des gleichnamigen Beitrags von A. Kaiser und R. Lades, 
in: Zeitschrift für Betriebswirtschaft 
Vol. 48. 
No. 3 
(1978), 
pp. 373–380.